Track doubling between Contone and bridge over Ticino River
Civil engineering
Work on the track doubling between Contone and bridge over Ticino River on behalf of SBB in Bellinzona started in September 204.
SH2 Data Center in Gland
Data Center
The work includes 18MW of IT capacity to complete Stack Infrastructure's data center network in Switzerland, SH1, SH3 and SH4.
Key features:
The Torretta Bridge
Civil engineering
In Ticino, the CSC Costruzioni Team carries out the semi-interchange is necessary to ensure faster access to Bellinzona by avoiding the crossing of the agglomerations of Camorino and Giubiasco.
N2 Gentilino-Lamone (Lot 202)
Civil engineering
The largest contracted extraordinary maintenance work in Canton Ticino in the road sector in the past 30 years.
Three buildings on Rue des Maraichers - Geneva
Buildings
Located in an urban context composed mainly of semi-detached buildings in blocks more or less enclosed on the courtyard, the perimeter of the project is currently occupied by three buildings whose arrangement provides a counterpoint to the surrounding density.
Parc du Simplon in Renens
Buildings
The Parc du Simplon project envisions a new neighborhood in the heart of Lausanne-Ouest.
Tenero swimming pools - New replacement building
Civil engineering
The CST5 swimming pool project in Tenero -which is 100% realized by CSC for a total of 12.4 million Swiss francs- consists of a new replacement building with a series of swimming pools organized on a slightly raised platform and divided into an indoor and an outdoor part.
EP22 Campaccio
Civil engineering
These are works to preserve and modernize the existing route and widen the two Campaccio viaducts for a total section of 1.8 km, along the N02 highway north of the Mendrisio interchange, from km 8.200 to km 10.000.
Brenner - H41 Sill-Pfons Gorge
Tunnel
A strategic infrastructure project for the EU that will go a long way toward improving mobility and reducing pollution on the continent
H3A Silvaplana ring road - tunnel
Tunnel
Road tunnel to bypass the village of Silvaplana, with a total length of 719 m and an open-cut length of 30 m
Rive droite in Orbe
Buildings
Two green buildings in the heart of Switzerland
Mount Ceneri Basis Tunnel at Vezia
Tunnel
Excavation, securing and lining of two single-track railway tunnels with a total length of about 645 meters with little overburden.