Mount Ceneri Basis Tunnel at Vezia

Tunnel

Work description

Excavation, securing and lining of two single-track railway tunnels with a total length of about 645 meters with little overburden.

Download pdf

Duration: 2010 - 2016

Amount: CHF 63,300,000 (excluding VAT)

Customer: AlpTransit San Gottardo SA, Bellinzona

Progetti Correlati

Sign up for the newsletter