Tenero swimming pools - New replacement building
Civil engineering
Work description
The CST5 swimming pool project in Tenero -which is 100% realized by CSC for a total of 12.4 million Swiss francs- consists of a new replacement building with a series of swimming pools organized on a slightly raised platform and divided into an indoor and an outdoor part. The tender-based project involves only contractor's work.
This project is Minergie certified.
- 15,000 sq m: reinforced concrete structure approx.
- Approx. 15,000 sq m: yellow tank
- Approx. 1800 tons: reinforcing iron
The project in its entirety includes the following macro categories of works to be carried out:
- Piles
- Earthworks
- Concrete structures and prefabricated elements (interventions covered by this contract)
- Steel constructions
- Installations
Duration: 11.2023 - In corso
Amount: CHF 12.4 million
Customer: Ufficio Federale delle Costruzioni e della Logistica UFCL