The Torretta Bridge
Civil engineering
Work description
In Ticino, the CSC Costruzioni Team carries out the semi-interchange is necessary to ensure faster access to Bellinzona by avoiding the crossing of the agglomerations of Camorino and Giubiasco.
The project also includes the construction of an elevated semi-interchange to ensure the connection between Bellinzona c, of a new deck while maintaining part of the substructure of the existing one, with a structural type in prestressed concrete with a mixed steel-concrete structure.
Download pdfData: 07.2023
: 07.2023 - In corso
Video gallery