The Torretta Bridge

Civil engineering

Work description

In Ticino, the CSC Costruzioni Team carries out the semi-interchange is necessary to ensure faster access to Bellinzona by avoiding the crossing of the agglomerations of Camorino and Giubiasco.

The project also includes the construction of an elevated semi-interchange to ensure the connection between Bellinzona c, of a new deck while maintaining part of the substructure of the existing one, with a structural type in prestressed concrete with a mixed steel-concrete structure.

Download pdf

Data: 07.2023

: 07.2023 - In corso

Video gallery

Sign up for the newsletter