SH2 Data Center in Gland
Impresa Totale
Work description
The work includes 18MW of IT capacity to complete Stack Infrastructure's data center network in Switzerland, SH1, SH3 and SH4.
Key features:
- Dual power supply from the grid
- Concurrently maintained mechanical systems
- PUE of 1.3 to 1.8
- Cooling of data rooms by chilled water-fed CRACs.
Performance:
- Electrical system modeling using failure mode and effect analysis (FMEA)
- Statistical analysis of the single point of failure (SPOF) and RAMS
- Modeling of annualized PUE (Power Usage Effectiveness) to predict energy and carbon use
- Water use effectiveness (WUE) calculation to predict water use
- CFD modeling for airflow within data rooms
- Arc Flash study
- Conflict-free 3D models through collaborative interdisciplinary coordination
Duration: 07.2021 - In corso
Amount: 131'500'000 CHF
Customer: Stack Infrastructure
Related contents
news
23/06/2021
Innovation and sustainability: CSC Costruzioni wins contract worth CHF 132 million for SafeHost Data Center in Suisse Romande
CSC Costruzioni (Webuild Group) has been awarded a contract worth CHF 131.5 million (€120 million) to build an additional 18MW of capacity for Safe Host's data center in Gland (Canton Vaud), Switzerland.