SH2 Data Center Gland
Totalunternehmen
Objektbeschreibung
The works include for 18MW of IT capacity, to complement Safe Host’s data center network
in Switzerland, SH1, SH3 and SH4.
Key features of this data center project:
- Dual feed electrical supplies from the grid
- Concurrent maintainability mechanical systems
- PUE of 1.3 – 1.8
We have access to a number of specialists to support us in simulating data centre conditions:
- Electrical system modelling using Failure Mode and Effects Analysis (FMEA)
- Statistical Single Point Of Failure (SPOF) analysis and RAMS
- Annualized Power Usage Effectiveness (PUE) modelling to predict energy and carbon usage
- Calculation of Water Usage Effectiveness (WUE) to predict water use
- CFD modelling for air flow within the data halls
- Arc Flash Study
- Reliability availability Maintainability Studies
- Clash-free 3D models through collaborative interdisciplinary coordination
Dauer: 07.2021 - In Bearbeitung
Auftragswert: 131'500'000 CHF
Auftraggeber: Safe Host SA
Contenuti correlati
news
23/06/2021
Innovation und Nachhaltigkeit: csc erhält den Auftrag über 132 mio. CHF für das SafeHost Rechenzentrum in der Französischen Schweiz
Csc costruzioni sa (Webuild Group) erhält einen Auftrag in der Höhe von 131,5 Mio. CHF (120 Mio. €) für den Bau einer zusätzlichen 18-MW-Kapazität für das Safe Host-Datenzentrum in Gland (Kanton Waadt), Schweiz.